Monday 15 April 2013

Keys


Settlement

Finally, we settled today yahooooooooooo after mamoth effort of 1.2 years. All of the issues were sorted even painter was in my place till last minute. Tiles have been delivered and tiler is coming tomorrow, wardobe guys coming next Monday to install the pantry/wir/LP/builtin fitouts. We are moving on Saturday, thank you Edenbrae.

Thursday 11 April 2013

Final PCI

We just came back after the inspection , we have signed off the PCI items list and settling on Monday, still few small jobs need to be completed , its me and between SS and these issues going to fix tomorrow so I hope these will be fixed before Monday. I didn't want delay as have already lined up tiler,tiles,wardobes on Monday. I trust SS so he fix small issues.

Fixed Issues:

1) Down pipes fixed

2) Nawkaw fixed brick chips but they forgot to fix the balcony area, coming tomorrow to fix this

3) Brick Capping

4) All paint touch ups

5) Fixed mortar inconsistencies

6) Balcony handrail replaced

Pending Issues:

1) Clean the mortar work

2) Fix the Garage slab chips

3) Stairs paint , one tread has lot of scratches

4) Alfresco stacker door still has small dent

Overall I am excited lot of issues are fixed and few small issues are still there.

Tuesday 2 April 2013

PCI

We had PCI on 27th, all went ok and I am so much relieved. We didn't have much issues inside only paint touch ups, garage slab chips and few more but having few outside issues

1) Bricks Chipping PGH coming next week do Nawkaw

2) Downpipe , SS confirmed this will be fixed.

3) Mortor issues will be fixed

4) Brick capping, SS advised me to escalate with the management. I escalated to the Management and it sorted out in 15 min and got call from SS, brick capping will be installed next week.

So, all my problems resolved and very happy. Hopefully we are settling on 12th of April. We are doing our own flooring after handover , SS was so nice to delay the electric appliances delivery for 1 week unless the flooring done. Thank you Edenbrae.