Tuesday 18 December 2012

Independent Inspection

We had Independent Inspection on Sunday and Howard forwarded the report on Monday. There were no major issues but lot of minor issues. Good news SS acknowledged these and will address these issue. Here are the issues he found

1) Gap between window frames and the brick work

2) rear sliding door damaged sill

3) garage slab floor need protecting as they are intended to be a furnished surface

4) mortor issues (which we already raised with SS)

5) Garage , Copper pipe needs saddle to be fitted to hold this pipe to the brick work

6) Rear door steel frame and hinges are in rusted condition

7) W/C shower , wall noggings incomplete

8) Guest Bedroom , Ceiling trimmers incomplete around the sewer duct pipes

9) 1st Bedroom/Robe, Wall noggings incomplete

10) 4th Bedroom/Robe, Wall noggings incomplete

Thursday 13 December 2012

Lower Roof

Finally we have lower roof. It took so long to get the lower roof done, I was pushing hard SS. SS excused was due to early last week rains roofing people had few jobs in pipe line so they had to finish these before turning up at our place. Hopefully lower eaves should be done today or tomorrow. I am loving my bricks, the more I look the more I love them. We should have Independent Frame Inspection late next week finger crossed though.
 








 

Saturday 1 December 2012

Bricks Cleaned

Here are few latest pictures of the house after brick work cleaned and scaffloding removed. We are having inspection on Tuesday so will raise our concern with SS about the minor mortor issues.